The review period needs to start soon (by Tuesday 2020-07-21), and I
need some help to get this ready using the new pandoc system. If the
pandoc conversion doesn't work as expected, I will have to do everything
manually using MS word.
Can someone please provide me with the docx version of the "existing"
Baseline Requirements (or show me how to get it), so I can compare it
against the docx version we currently use to produce the PDF of the BRs?
This will be my first check.
Once I verify that there are no differences (other than formatting) with
the current BRs, I will ask for the docx version produced by ballots
SC30 and SC31 combined, unless someone shows me how to produce this
combined docx version on my own.
Since we're doing this for the first time (relying so much on pandoc
conversion for the review period) I will definitely need a second pair
of eyes to confirm that the contents of the ballots are indeed
incorporated into the produced combined docx/pdf that will be sent to
the WG. This will probably be Wayne or Ryan (proposer of both ballots).